And it had to be delivered commercially: tendered competitively, value-engineered to a budget, and built by a national contractor under Design and Build, with the design team novated across mid-project.
The full story
The design amendment did the planning work. Rickett Architects took the consented scheme through detailed design and secured a design-amendment consent from North Devon Council, ref 47211, that improved the elevations: fully glazed sea-facing balconies with zinc-clad returns, external timber terraces and steps, a simplified zinc canopy, cleaner glazing with the transoms removed to open up the views, and a raised stone boundary wall with set-back gated access. The planning officer accepted the changes as betterment of the approved scheme and granted them under delegated powers, lifting the design without putting the consent at risk.
Then it was made buildable, and affordable. The full technical design, the Employer's Requirements and the specification were produced in house, then worked through competitive tender and a value-engineering exercise with the cost consultant to bring the scheme within budget, before it was let as a Design and Build contract and the team was novated to the contractor to deliver the production information. The pre-commencement and technical conditions were discharged, Building Regulations ran through an Approved Inspector, and the structural, civil, services and landscape consultants were coordinated through the retaining, the drainage and the falling levels.
The exposed setting set the specification: local slate, natural stone, render, zinc and glazed balustrades chosen to sit on the clifftop and last in salt air, with the timber privacy panels between terraces echoing the groynes on the beach below. Ahead of its time for 2007, the scheme used whole-building energy modelling, solar thermal panels and airtightness testing. And with apartments selling off-plan during construction, purchaser-specific layout and finishes drawings were produced unit by unit, so the sales programme and the build programme could move together.